Main stages of repair in the home

Main phases of repair in the apartment.

How to begin repair of the apartment?

The first phase of the repair of old homes is the damage and taking apart firstly of the worn out walls and partition walls, removing the wall and ceiling finish. This phase is among the most "unclean" stages of the repair.

One more amongst the most crucial and "dusty" works is the window block replacement. It is necessary to do this first of all due to the fact that dirt and dust will be unallowable throughout following stages and it is restricted at all to open windows during painting and wallpaper works (large drops of the temperature and moisture are unallowable). After installing windows and windowsills it is essential to load them right away in polyethylene film and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following phase is wiring. Wiring can be installed in walls or along the floor. Circuitry is made inside the pipes to make sure electrical security and increase reliability. The pipeline secures wiring from external damages and allows to change the wire totally without breaking walls and flooring just by placing the brand-new wire rather of the old one.

House Painting follows the wiring. The regular error during the synchronised conducting of such works takes place when workers forget to set out one of the cables and home painters have already plastered and smoothed out the wall. As a result, extra works are essential to seal chases after on the completed wall. The places of the feed switch and wall outlet place and their number need to be thought-out ahead of time. The plan of power circuitry is generally included into the style project.

Later on the system need to be prepared to service in case of failures. safety tips In addition to the circuitries, the telephone cable television and the TV cable television are set out. The power cable should not be set out near the telephone and antenna cables to prevent noise pickup and disturbance. The most peculiar minute is laying out the television cable television. In order to make two (or 3) television set in the house the second cable television is typically merely "securely soldered" in parallel, so the cable television resistance is lowered. As a result, the screen quality is degraded, lots of programs can't be received and etc. In order to prevent such circumstance it is necessary to invite a specialist with special equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

image

Painting is the most long-term procedure, that is why it is performed simultaneously in all properties, if it is possible. Hold-ups are related to the technology. Each applied layer of the plaster (or filling in ending up) must dry entirely before the work will continue.

Works in hygienic arrangements and the kitchen begin concurrently with home painting. It is much better to meet so-called "dirty" works in the top place and concurrently. In accordance with the plan of the hygienic specialist area welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then operates in hygienic arrangements are performed according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the flooring. And at last other plumbing article sanitary devices, mixers and accessories are mounted.

After wiring, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not installed throughout this phase in order to save their surface appearance. The finish puttying of walls is conducted simultaneously. The highly exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines moisture of the material.

The following stage is the process of fill. Fill can be made with different products-- from typical masonry cement-sand mixture to self-aligning floors. The benefit of the basic mix is its cheapness, the disadvantage is that such mix is much more difficult aligned at the level and the final dry time of such fill is 40 days, only then the next stage of the work with floor can be performed, i.e. the period is too long. Self-leveling self-aligning floors are much more pricey, but more technological. Aligning takes place practically "instantly" i.e. fluid option of mix is put out, then it runs and you receive the horizontal surface. The last dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is set up into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry lining up (the fill innovation) is used bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors must take into the account thickness of future floor covering. After setup the door can be removed its hinges and eliminated till the end of repair work or loaded into polyethylene movie to protect from damages. Concurrently ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile must be laid on the absolutely dry overlay.

Finishing of the floor installing depends on the planned covering. For the most part (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close repairing of plywood and long-term service of the flooring without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After mounting of the plywood is finished, wallpaper for painting can be pasted on walls.

In properties where finish covering of the floor is laminated flooring or parquet hoard, the normal wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.

If finish covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned repercussion is connected only with such scrambling procedure when the excellent quantity of dust is produced. In spite of the fact that excellent floor mills are equipped with the vacuum cleaner, the adequate quantity of dust is sped up on surrounding topics including walls. Dust is extremely acerbic and is badly washed off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be considered to be completed. It is left only to set up the plinths, decorative aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is essential to keep in mind that the sequence of works was listed in basic and can alter depending upon the definite scenario-- the number of rooms in facility, your resources, peculiarities of the building of the multilevel facilities. It is based on sound judgment and everyone capable of analysis can individually produce such a series.